Well, this weekend we locked ourselves in (a little tooo tightly - sorry Grandma & Grandpa R). And we worked worked worked! We have ALL the cabinets installed, the granite has been fixed - thanks to Granite Design of IL, the door pulls are all installed and I have about 80% of the kitchen stuff put away. The refrigerator was delivered and the old one taken away. We had a plumber in this morning and he installed the dishdrawer, faucet, drain, and fridge ice/water line. I need to do some modification so I can add a pull-out self... but we're doing really well! Here are some pictures of our progress!!

Running water!

genius dishwasher/dish placement - put dishes away without straining myself!

the island - Almost!


Lighted front glass front cabinets for my beautiful crystal and barware

Cabinets with pulls and all installed! - we're adding a door over the microwave (above the dishwasher)

Cabinet doors open - with food and such inside!

End of island - we're ordering panels to cover this area (expansion for stove hood) the panels will be the same as the cabinets from Scherr's

And this photo accurately reflects how E and I feel! (My crazy kitty Kisses)

Monday, July 23, 2007

Granite is finished!

While I was away this last week the granite was delivered and installed! Whoo-hooo... I saw the new sink last night when we got home and it looks awesome - it's HUGE! (Maybe it only looks gigantic because I've been using the bathroom vanity for so long!) I did get all but a couple of pulls on last week - I was waiting to install the doors by the sink until that gets hooked up. And now E can get the last cover panel and big cabinet installed and we can move on! I can still see the light at the end of the tunnel - I know it's possible to finish eventually!!! E sent me this photo from his phone...

Tuesday, July 10, 2007

Delays prevail!

So the kitchen has been kind of on hold because my Grandmother is ill, so E and I have been up and down the road to Galesburg a lot to visit. BUT E did manage to get the cabinet rebuilt for the dishwasher and we are now ready for granite (again). I think my guys are busy because I can't seem to get in touch with them, but I'm sure they'll remember I owe them a bunch of money so I have no doubt they'll call back soon!

This weekend (after Harry Potter, of course) I'm hoping to get all the pulls installed and the new closet mudding finished. Then I have to run out to IKEA to get 4 stupid plastic things so I can finish the drawer fronts.

Then once the granite is in I can put up the last big cabinet and cover panels and we can have the dishwasher installed once the sink is hooked u
p.

**sigh**

I'm hoping to be 90% done this weekend... just waiting on granite and the sink!!